Case Studies

Process and Distribution Center

Performed a complete energy analysis on a 800,000 ft2 facility consuming $1.54 million in utilities.

RESULTS: Fourteen projects of promise were identified, totaling an energy reduction of 24,502 Btu/ft2/year, or about 24.8% energy utilization reduction. The total cost was $363,000. These projects provide a savings of $431,000 per year in gas, electricity, and water charges, or a 27.9% reduction in the total annual bill.

Carbon Footprint reduced by 30% or 7,300 tons, equivalent to removing 1,280 vehicles.


Photovoltaic Manufacturer
Performed a facility energy analysis on a 170,000 ft2 facility consuming $1.48 million in utilities.

RESULTS: Identified a range of annual savings between $150,000 to $220,000.

Carbon Footprint reduced by 14.3% or 3,800 tons, equivalent to removing 600 vehicles.


Historic Building
Examined in detail the energy performance of the historical building with nominal floor area of about 2,600 ft2

RESULTS: Currently operating at 124,000 Btu/ft2/year with the energy reduction strategies implemented, the EUI can reasonably be reduced to about 43,000 Btu/ft2/year.

Carbon Footprint can be reduced by 68%, saving nearly 12 metric tons of CO2 per year!


Click here for a presentation about energy efficiency

green2

case